Services / TPS Consulting
Service 04 of 7
The Toyota Production System, implemented the way it was designed to work — as a management discipline, not a poster on the wall.
Overview
TPS is built on two pillars — Just-in-Time and Jidoka (built-in quality) — supported by standardized work, levelled production (heijunka), and a culture where problems are surfaced immediately rather than hidden. We help you implement all of it as a connected system, not a set of independent tools borrowed for a poster.
This is the deepest and most demanding of our service lines, and usually follows a Lean or Kaizen engagement once the basics of flow and waste elimination are already in place. It's a genuine operating-system change — pull-based production, andon-driven problem escalation, standardized work at every station — done properly, with your management team leading it, not us.
“TPS isn't a toolkit you install. It's a way of managing that makes problems visible the moment they happen.”
— Vivekanand Shankar, Chief ConsultantProblems We Help Solve
Defects or breakdowns are discovered downstream, or the next shift, instead of the moment they actually happen.
The same job gets done a different way depending on who's running the station that day, with inconsistent results.
Schedules are built on forecasts rather than actual downstream demand, so inventory piles up in the wrong places.
Operators keep running even when something's clearly wrong, because there's no accepted mechanism to flag it and stop.
Our Approach
We sequence TPS in the order Toyota itself learned it — stability and standard work first, then pull, then built-in quality.
Document the current best-known method for every station — the foundation everything else in TPS is built on.
Introduce kanban-based pull signals and level the production schedule so work flows at a steady, predictable rate.
Build in the ability — and the expectation — to stop the line the moment a defect or abnormality is detected.
Train supervisors and managers in the daily routines — gemba walks, tiered problem-solving — that keep TPS running without us.
Key Benefits
Andon-driven escalation means issues are addressed in minutes, not discovered days later.
Standardized work means output quality no longer depends on who's on the station.
Pull-based scheduling means you build what's needed, not what a forecast guessed.
Daily routines your supervisors run themselves, long after our engagement ends.
Relevant Industries
Related Case Studies
Outcome: Line stoppage response time down from 45 minutes to under 5. First-pass yield up 22% within six months.
View Case StudyFrequently Asked Questions
Not strictly, but it helps. TPS builds on the flow and waste-elimination foundations those engagements establish, so we often sequence them first.
A genuine implementation across standardized work, pull, and jidoka typically runs 6 to 12 months, rolled out area by area.
No — TPS originated in automotive but applies anywhere there's repetitive, high-volume production with a defined process flow.
Line supervisors and plant management, at minimum — TPS is a management system, so it has to be led by the people who run the floor day to day.
Ready to Begin?
Tell us what's broken or what needs certification. We'll respond within one business day with a clear scope and no-obligation assessment offer.