Services / Productivity Improvement
Service 05 of 7
Finding out exactly where your capacity is being lost — and closing that gap — before you spend on more machines or more headcount.
Overview
Most plants aren't short on capacity — they're short on visibility into where that capacity is actually going. We measure real output against theoretical capacity (OEE, line balance, labour utilisation), find the specific bottleneck stations and non-productive time, and fix those first, before recommending anything that costs capital.
This engagement is quantitative by design. Every recommendation is backed by time studies, downtime logs, or line-balance data — so you know the expected impact before committing resources to fix it.
“Before you buy another machine, find out what your current ones are actually capable of.”
— Vivekanand Shankar, Chief ConsultantProblems We Help Solve
Machines and lines are rated for a certain output, but actual production consistently falls short — and no one can say exactly why.
Small stoppages throughout the day never get logged individually, but together they're eating a significant share of run time.
One station quietly paces the entire line while others sit under-utilised, and it's never been formally identified.
The instinct is to add a machine or a shift before confirming whether existing capacity is even being fully used.
Our Approach
We measure before we recommend — every finding here is backed by data collected on your floor, not a benchmark from somewhere else.
Measure Overall Equipment Effectiveness — availability, performance, and quality — against theoretical capacity for each line.
Detailed time studies at each station to find the real cycle time and identify the pacing bottleneck.
Redistribute work content across stations so no single point limits the whole line's output.
Implement fixes and track OEE and output weekly, so gains are confirmed with data, not assumed.
Key Benefits
More production from the equipment and headcount you already have.
A documented number to track and defend improvement against going forward.
No more guessing which station is actually limiting your line's output.
If new equipment is genuinely needed, you'll have the data to justify it — and know it isn't a workaround for a fixable gap.
Relevant Industries
Related Case Studies
Outcome: OEE improved from 61% to 79% in 14 weeks through line balancing and downtime reduction — no new equipment purchased.
View Case StudyFrequently Asked Questions
Overall Equipment Effectiveness combines availability, performance, and quality into one number showing how much of your theoretical capacity is actually being used.
No. The goal is getting more output from existing resources, not reducing headcount — most gaps come from downtime, imbalance, and non-standard work, not overstaffing.
Initial data collection and analysis typically runs 3 to 5 weeks, followed by an implementation phase depending on what's found.
Related but narrower — a Process Audit reviews the whole operation broadly, while this focuses specifically on quantifying and closing a capacity or output gap.
Ready to Begin?
Tell us what's broken or what needs certification. We'll respond within one business day with a clear scope and no-obligation assessment offer.